This message is to notify you about a major network upgrade we are going to perform. As mentioned previously, we are upgrading core network equipment again and increasing connectivity to multiple reliable high level connections to various upstream ISP's, the fastest available online today.

The upgrade will happen in two steps. The first step will be done on Saturday between 3AM and 11AM GMT (9AM and 5PM CST). During that period there may be multiple short interruptions (1-2 minutes).

The second step of the upgrade will happen on Wednesday at 12AM GMT (6AM CST). The maintenance window we have for it is about 30 minutes. We expect it to take less than 15 minutes though.

Thank you for your understanding.



Sunday, February 6, 2022

« 返回

Powered by WHMCompleteSolution